Engineering

Print

Construction Plans

Type

Fee

PDF Electronic Copy

$10.00

Paper Plan Sets

At Cost

Lawn Grades

Type

Fee

Engineering Lawn Grades

$40.00 per occurrence

Permits for Work within the Right of Way

Type

Category

Fee

Notes

Underground Utility Installation / Repairs

 

Contractor Bond to Work Within City Right-of-Way

$25,000.00

Minimum

Insurance Required to Work Within City Right-of-Way

Same as City Construction Contract (General Conditions Section 00800)

Boring/Trenching and Excavations



$250.00*

0'-500'

$550.00*

501'-1500'

 $1,250.00* 1501'+
*Fee includes $20.00 Storm Water Application Fee

Overweight/Overdimensional Vehicle Permit

                                           Type              Fee
 Overweight/Overdimensional Vehicle Permit                               $20.00  Each

Wireless Telecommunication Facilities Within Right-of-Way

 

TYPE

Fee

Notes

 

Permit

$250.00

Each

Annual Rent

$150.00

Each
Annual Maintenance

 $25.00

Each

Power less than or equal to 100 watts

$73.00

Per radio node

per month

Power greater than 100 watts
 $182.00

Per radio node

per month

Driveway Approach, Curb, Gutter, Sidewalks

Type

Fee

Notes

Driveway Approach

$30.00

Each

Curb & Gutter or Sidewalk (excluding driveway width)

$0.75

Per Linear Foot ($10.00 Minimum)

Contractor Bond to Work Within City Right-of-Way

$5,000.00

 


Insurance Required to Work Within City Right-of-Way

Same as City Construction Contract (General Conditions Section 00800)

Stormwater

Type

Fee

Notes

Grading/Erosion Control Permit

$20.00

Up to 1 Acre

$10.00

Per Additional Acre

Annual Permit for New Subdivisions

$250.00

 

Plan Review Fee for Privately Financed Infrastructure

Type

Fee (Percentage)

The first $100,000 of estimated construction cost:

2%

All cost above the first $100,000 of est. construction cost:

1%

Maps

Type

Fee

Notes

All Maps 11" x 17" or less

$0.00

 

All Maps plotter size C or larger

$10.00

 

Special Mapping requests or custom projects

$40.00

Per Hour + Media Costs

Special Assessment Fees

Type

Fee

Notes

Administration Fees

5%

Of Construction & Engineering Cost

(Applied to all Assessed Projects)

Engineering Fees

11%

Of Construction Cost

(Applied to Publicly Financed Infrastructure Projects - Design and Construction by City)

Engineering Fees

7%

Of Construction Cost

(Applied to Publicly Financed Infrastructure Projects - Design Privately Funded; Construction Publically funded)

Special Assessment Rates

Type

 

fee

Primary Benefit Rate  Local & Minor Arterial/Collector Streets  
$30.00 per adjusted front foot 

Urban Mill & Overlay

 

Rural Mill & Overlay $15.00 per adjusted front foot 
Rehabilitation (limited curb & gutter repairs) $61.00 per adjusted front foot 
Reconstruction (full curb & gutter replacement)  $105.00 per adjusted front foot 

Secondary Benefit Rate

 

 

Minor Arterial/Collector Streets   
$500.00 per equivalent single family lot 
Mill & Overlay, Rehabilitation, Reconstruction 
Sidewalk Panel Repairs  (not otherwise included in a street project)  $7.00 per square foot 
Curb & Gutter Repairs  (not otherwise included in a street project)  $20.00 per lineal foot